Program Calendar
A 3 Phase Approach. The Program is structured in 3 main phases:
- Phase 1 – From now until 2020 with a strong emphasis on the setup of the rural energy master plan and the implementation of ongoing/planned projects;
- Phase 2 – From 2020 to 2025, with acceleration and roll out of the main initiatives;
- Phase 3 – From 2025 to 2030, the consolidation phase when most people will be electrified.
The following maps show the rural energy sector infra-structures already deployed at the end of each phase.
EVOLUTION OF LIBERIA'S POWER SYSTEM - PHASE 1, 2 AND 3